- Transport on Line -

GENERAL CARGO TERMINAL

The timber complex production - handling complex MI comprises three
wharves which are NN 10, 11, 12 to handle every possible general kinds
of cargo. The overall length of wharfing line is as follows:

WHARF N10

is the wharf for loading technological chips.

WHARF LENGTH is 210 metres

WHARF DEPTH is 11 metres

The wharf is equipped with the facilities to unload the cars and trucks
with the help of conveyors with two vessel-loading lines having the capacity
of 300 tons per hour as per one vessel-loading machine. At the present
time the said wharf handles ships with cargo capacity of 5,000 tons through
30,000 tons. Open depots
have the capacity to store up to 90,000 tons of technological chips and
they can be used for storing any kinds of cargo to be loaded aboard the
ships with the help of mobile cranes with loading capacity of 16 tons.

WE ARE READY TO CONSIDER ANY PROPOSAL CONCERNING HANDLING OR TRANS-SHIPPING
GENERAL CARGOES AT THE SAID WHARF. TODAY WE HAVE ENOUGH EXPERIENCE OF WORKING
WITH SAWN TIMBER, ALUMINIUM, LUMBER AND OTHER CARGOES!

WHARF N11

is the wharf for trans-shipping timber cargo. But during the years of
its operation they have gained a large amount of working experience with
any general and bulk cargoes.

WHARF LENGTH is 190 metres

WHARF DEPTH is 11 metres

The wharf is equipped with three cord railway lines as well as with
three rear railway lines. 4 "Sokol" cranes are installed at the
wharf. They have the loading capacity of 16 tons each.

Two "SUMITOMO" bridge reloaders with the loading capacity
of 16 tons each. The capacity of storing areas is up to 30,000 tons of
sawn timber. The wharf has handled up to 750,000 cubic metres of lumber.

WHARF N12

is specialized in trans-shipping metals but it can handle any general
and bulk cargoes.

WHARF LENGTH is 190 metres

WHARF DEPTH is 11 metres

The wharf is equipped with 3 "SOKOL" portal cranes with loading
capacity of 16 tons each and 1 "CONDOR" crane with loading capacity
of 32 tons. The rear part of the wharf has 2 "MITSUBISHI" bridge
reloaders with loading capacity of 20 tons each in operation. The yearly
cargo handling capacity reaches 1 min tons today.

WORKING HOURS

The complex is in operation 24 hours a day. Seven days a week.

WE ARE READY TO CONSIDER ANY PROPOSAL CONCERNING HANDLING CARGOES!